A Perfect Lot to Start the Project
|
Joe and Myra Cutting the Ribbon
|
First Dirt Moved 14 November 2006
|
A Big Hole for the Garage
|
Trenches for the Garage Footings
|
Rebar and Sewer Pipes
|
First Concrete Poured 15 December 2006
|
Garage Footings Poured
|
Concrete Poured for Garage Walls
|
Forms Removed from Garage Walls
|
Retaining Wall Along the East Side
|
Forms for Footings of the Main House
|
Footings Completed for the Main House
|
Garage Floor Poured
|
Walls Start to Go Up
|
Floor Joists for the Lower Level
|
Crane Setting the Cross Beams
|
A Good Place to Add a Window
|
The Framing is Almost Complete
|
View of the Back Bedrooms
|
Frame Covered and Roof Completed
|
Windows Installed
|
Porch Taking Shape and Siding Added
|
Siding Painted and Garage Door Installed
|
Stone Laid on Garage and Porch Columns
|
Inside, the Cabinets were Finished
|
Driveway Finished and We Moved In
|
Greeting at the Front Door
|
Entry Stairs
|
View from the Living Room
|
Fireplace
|
The Elevator
|
Enjoying the Back Deck Under the Oaks
|
Sinks in Master Bathroom
|
Tub in Master Bathroom
|
Pavers in the Patio
|
Hummingbird Wall Lamps
|
Hummingbird Doorbell
|
Hummingbird Mailbox
|